About Solexperts
Solexperts' Services
Solexperts' Products
Current Projects
  Borehole Surveys
  Reactive Barrier, Willisau
  Gas Migration Test (GMT)
  Basel Tunnel Luzernerring
  Mine-collapses studies
  Bern, enlargment of the Rathaus parking facility
  ANDRA-France
  Emosson
  Hybrid MPS Japan
  Pump MPS Japan
  Brenner Base Tunnel
  Bois de Peu Tunnel
  hiDCon: LTF
  hiDCon: Chienberg Tunnel
Finished Projects
Download
Solexperts News
Links
 Contact   Corporate Information   Search  Languages:    De       En       Fr    

  Current Projects / Hybrid Multi-Packer Systems Tono, Japan

An Underground Research Laboratory is under construction in Tono, Japan. A couple of deep boreholes were drilled in the surrounding of the shaft for long-term groundwater monitoring and groundwater analysis.

Solexperts developed two Hybrid Multi-Packer Systems which have been designed specifically for the needs of the customer. The Japan Atomic Energy Agency (JAEA, formerly JNC) ordered Solexperts, together with our Japanese partner GERD, to install two Hybrid Multi-Packer Systems into two deep boreholes (borehole length 1012 m and 1300 m, borehole diameter 333 mm to 134 mm).

The Hybrid-Multi-Packer System consists in the lower part of a conventional Multi-Packer System (MPS) and in the upper part of a Stand-Pipe Multi-Packer System (SPMP).

Both systems implemented in Japan, allow groundwater monitoring and water sampling from 10 isolated borehole sections.
Installation of interval packer of the MPS-System part Packer Ø 324 mm!
Interval access module of the SPMP-System part Transition-Part: From MPS- to SPMP-System part
Well head: standpipes are equipped with pressure transducers
Top ^^  
Copy rights by © Solexperts 2004