About Solexperts
Solexperts' Services
Solexperts' Products
Current Projects
  Borehole Surveys
  Reactive Barrier, Willisau
  Gas Migration Test (GMT)
  Basel Tunnel Luzernerring
  Mine-collapses studies
  Bern, enlargment of the Rathaus parking facility
  ANDRA-France
  Emosson
  Hybrid MPS Japan
  Pump MPS Japan
  Brenner Base Tunnel
  Bois de Peu Tunnel
  hiDCon: LTF
  hiDCon: Chienberg Tunnel
Finished Projects
Download
Solexperts News
Links
 Contact   Corporate Information   Search  Languages:    De       En       Fr    

  Current Projects / Pump Multi-Packer Systems Namikata and Kurashiki, Japan

The Japan Oil, Gas and Metals National Corporation (JOGMEC) constructs storage facilities for oil and gas (LPG stockpiling) which are located at Namikata and Kurashiki. Several boreholes were drilled and equipped for groundwater monitoring.

In april/june and september/november 2005, a total of four Solexperts Pump Multi-Packer Systems were successfully installed at Namikata and Kurashiki.

Up to five borehole sections can be isolated for hydraulic investigations and water sampling in boreholes of 76 mm diameter with the Solexperts Pump Multi-Packer System.

At each interval level, a double-valve pump and a pressure sensor is integrated in the Pump Multi-Packer System. Water samples can be taken from each interval. The use of PVC casing keeps the costs for these systems low.
Namikata Field - tunnel portal Installation under rough conditions
Installation of an interval-packer Interval access module with integrated pressure sensor
Top ^^  
Copy rights by © Solexperts 2004